PIPELINE INSTALLATION CONTROL

Project: multi-beam bathymetric survey for the installation of pipelines in the coastal area of Miramar, Nicaragua.

Client: Geohidra / Consorcio T&D / Albanisa

Date: February 2016 – August 2017

Place: Miramar – Nicaragua

Description:

This project was executed between February 2016 and August 2017. Hidroproyectos was in charge of carrying out the integral control of the 4k underwater pipeline installation diameters 8″, 12″, 16″, 20″ and 24″using an integrated multi-beam SeaBat T-20P system to carry out the bathymetric control of the installation.
Additionally, underwater acoustic positioning with USBL and vessel positioning were performed. All the equipment used had differential correction through a previously installed base device.

Descargar